Economic Estimation of Heat Storage Type Geothermal Source

Boiler(ton/h) 1 2 82,800 Brine(ton) 14.0 1 25,200 Automatic control pipe 40,000 Heat exchanger(kcal/h) 604,800 2 23,500 Equip. cost "A" minor total 426,900 Electric power Equipment 10,000 Cooling water/Brine pipe 85,000 Automatic control 45,000 Gas Piping/Gas duct …

Get A Quote

APPROVED DOCUMENT - GOV.UK

the renumbering of regulations in the Building Regulations 2010 and Building (Approved inspectors etc) Regulations 2010. There have been no changes to the requirements in Part F of Schedule 1 to the Building Regulations, but please note the simpler definition of 'room for residential purposes'. MAIN CHANGES MADE BY THE 2013 AMENDMENTS

Get A Quote

LiveSmart BC Training for Business Energy Advisors

Modular Services Company (Oklahoma City) 40,000 sq. ft. office and 70,000 sq. ft. manufacturing, 2-floor, new construction circa 2012 120 tons office AC, 70 tons plant heat, 37 units 72 – 400 ft. vertical bores with future expansion via retention pond heat exchanger Energy recovery from irrigation system HDPE single-pipe hydronic piping, variable speed primary-secondary…

Get A Quote

On variations of space-heating energy use in office buildings

• 100,000 ft2 Office Building in Vancouver • Total air supply 1 cfm/ft2 pr 100,000 cfm • Outside air at 20% or 20,000 cfm (1000 people at 20 cfm/person) • 2.12 cfm per L/s so there are 9434 L/s • Based on HDD of 2800 C for Vancouver (10 year average) • Thermal balance point in the building …

Get A Quote

VAT rates on different goods and services - GOV.UK

Three directly applied to the whole-building energy use, which includes heating systems, liquid natural gas (LNG) fired conventional boiler, other end uses. The 3-D and plan views of the large-size office building. (b) The 3-D and plan views of the small-size office building. Fig. 1. The large- and small-size office buildings from the

Get A Quote

Building the Case for Net Zero - UK Green Building Council

01/03/2016 · The case study is a commercial and office building consisting of six separate blocks as shown in Fig. 1 with 175,000 m 2 area of commercial and office places, in 26 stories, along with a 160,000 m 2 area of parking spaces in 7 stories. The three mechanical rooms (between each two blocks one mechanical room has been considered) in this project are embedded in the seventh floor …

Get A Quote

On variations of space-heating energy use in office buildings

UK Green Building Council | Building the Case for Net Zero UK Green Building Council | Building the Case for Net Zero Snapshot of findings NET ZERO OFFICE NET ZERO RESIDENTIAL 0 200 400 600 800 1,000 Baseline Intermediate Stretch Embodied Carbon (kgCO 2 e/m 2) 930 755 600 (LETI) 350 (LETI) Target 570 155 116 57 0 20 40 60 80 100 120 140 160

Get A Quote

Evaluation and sizing of a CCHP system for a commercial

01/11/2013 · For the basecases, the large office building has a boiler of 80% efficiency, while the small office building has furnaces of 78% efficiency. The High Boiler/Furnace Efficiency cases, assuming the use of condensing boilers and furnaces, have a boiler of 91% efficiency for the large office building and furnaces of 88% efficiency for the small office building.

Get A Quote

03 Related 14 0 tons office building lng boiler information